Philosophy
The VESSEL Integral Pre-fab Construction (VIPC) system is the foundation of VESSEL's delivery model. Every unit exits the Foshan factory as a 100% finished product — furnishings, mechanical systems, and smart controls fully installed and tested. On-site work consists only of connecting water and electricity.
VIPC was developed through 100+ real-world delivery projects across diverse terrain types including mountain peaks, dense forests, wetlands, deserts, and arctic environments. The structural engineering has been refined to withstand multiple long-distance transports and repeated crane lifts without deformation.
Logistics
Process
Factory Complete
100% finished unit leaves Foshan — furnishings, MEP and smart controls fully installed.
International Shipping
40ft Flat Rack, compliant with port loading standards. Delivered to 30+ countries.
On-site Crane Lift
No foundation, no excavation. Any terrain — mountain, forest, wetland or desert.
Connect & Operate
Water and electricity hookup only. Ready for guests in as little as 2 hours.
Performance